§ 34-86. Meter change in size.  


Latest version.
  • Size of the meter serving a premises may be changed at the request of the user upon payment of the estimated cost of making the change. Increase in size will require increase in the size of the service line in most cases. Meter size will not be changed for any premises more frequently than once per year. Meter size shall determine the minimum charge.

(Prior Code, § 73.075; Code 2006, § 13.5.14; Ord. No. 1495, § 1(13.5.14), 1-25-2011)