Division 1. GENERALLY  


§ 34-203. Definitions.
§ 34-204. Chapter provisions not exclusive.
§ 34-205. Waste deposited on public or private property unlawful.
§ 34-206. Privy, septic tank and cesspool not allowed for disposal of wastewater.
§ 34-207. Connection required.
§ 34-208. Connection permit required.
§ 34-209. Connection fee.
§ 34-210. Connection standards.
§ 34-211. Connection to be made by city.
§ 34-212. Excavations for sewer installation barricades and lights required.
§ 34-213. Connection cost; owner responsibility.
§ 34-214. Operation and maintenance of facilities; owner responsibility.
§ 34-215. Private system allowed when.
§ 34-216. Private system fee.
§ 34-217. Connection required when sewer available.
§ 34-218. Separate sewers required for each building.
§ 34-219. Old building sewers allowed when.
§ 34-220. Sewer construction standards.
§ 34-221. Sewer construction elevation.
§ 34-222. Prohibited connections.
§ 34-223. Discharge of untreated sewage to natural outlet unlawful.
§ 34-224. Discharge of certain unpolluted waters to sewer not permitted.
§ 34-225. Discharge of waters and wastes to sewer restrictions.
§ 34-226. Storm sewers.
§ 34-227. Superintendent authority.
§ 34-228. Interceptors requirement, location and maintenance.
§ 34-229. Pretreatment.
§ 34-230. Industrial cost recovery system.
§ 34-231. Observation and testing.
§ 34-232. Information required for determination of compliance.
§ 34-233. Tests and measurements.
§ 34-234. Special agreement allowed.
§ 34-235. Damage to wastewater facilities prohibited.
§ 34-236. Entry for inspection authorized.
§ 34-237. Information to be confidential.
§ 34-238. Lien on property.
§§ 34-239—34-308. Reserved.