§ 34-209. Connection fee.  


Latest version.
  • (a)

    The fee for connection of existing buildings to the sewer shall be as adopted from time to time by resolution of the City Council except that, if an existing building contains several distinct units as, for example, a multiunit residential building containing several distinct dwelling units, the fee for the first unit and for each additional unit shall be as adopted from time to time by resolution of the City Council.

    (b)

    The fee for connection of new single-family residences to the sewer shall be as adopted from time to time by resolution of the City Council for each residence.

    (c)

    For connection of new multiunit residential buildings to the sewer the fee for the first unit and for each additional unit shall be as adopted from time to time by resolution of the City Council.

    (d)

    The fee for connection of new commercial or industrial buildings to the sewer shall be as adopted from time to time by resolution of the City Council per 100 square feet of floor space of the building.

    (e)

    The fee for connection of new mobile home court spaces to the sewer shall be as adopted from time to time by resolution of the City Council for each space.

    (f)

    As used in this section, the term "existing" means fully constructed and finished on or before July 22, 1976, and the term "new" means fully constructed and finished after July 22, 1976.

    (g)

    The fees set forth in this section shall accompany the application for sewer connection permits. The fees set forth in this section shall be in addition to costs each applicant shall pay for the installation and connection of such sewer as provided by the ordinances of the city.

(Prior Code, § 70.120; Code 2006, § 13.10.7)